From SJRail.com Wiki
|
Welcome to the SJRail.com Wiki! (COOPER Tower and Interlocking Page)
COOPER Interlocking
could possibly be called the right arm of CENTER and a key to the operation of Pavonia Yard in East Camden.
By John Acton
Three tracks came down the hill from Center to the bridge and COOPER Tower.
Two tracks for the..
Connecting to
One track
All in one way or another added to the work of the Operators at COOPER and JERSEY and the Yard Masters at Pavonia Yard. Before the 1960's when the yard was rebuilt there were two yards in East Camden, East and West. During the construction of PATCO Hi-Speedline, the 32 track hump yard was built, and the diesel facillities were moved to the current River Road location,and the 2 story tower was closed and moved to the final location, west of River Road.
|
|
Tower Photos
|
From the collection of H. Gerald MacDonald
Cooper River Bridge Looking West Cooper River Bridge Looking East Nov 21 1958
|
PRR, Local A-34, Eng #8768 (BS-12m), Passing the "NEW" Cooper Tower April 4, 1965
|
|